Contractor consortium SaVe is engaged in construction of the infrastructure of the Theemsweg line in the Rotterdam Port area on behalf of the Port of Rotterdam. The construction consortium, which consists of Besix, Dura Vermeer, Mobilis, Hollandia Infra and Smulders, has already poured many cubic metres of concrete for construction of the railway viaduct and modifications to the road network. We supplied the filling blocks for the pouring process in over ten orders, varying from 42 to 185 cubic metres per order. See this website for more information about the construction of the 4 kilometre-long rail link.

Gewapend betonframe dat wordt opgevuld met witte vulblokken. Gewapend betonframe dat wordt opgevuld met witte vulblokken. Het is een drie laags fundering. Gewapend betonframe dat wordt opgevuld met witte vulblokken. Iedere laag wordt ondersteund door houtenbalken.